Project : Desander Pilot Project Installation at Temana and Bokor Field, PETRONAS Carigali, Sarawak Operations (2007 – 2008)
Desander Project at Bokor – BO-210
Fabrication of collector’s closure at fabrication yard
Complete installation of Liquid Desander complete with collector.
Installation of Desander at Temana TE-45.
Project : Wellhead Gas Desander Project Installation at Duyong Field, PETRONAS Carigali – Peninsular Malaysia Operations, (2011)
Gas Desander installation at Duyong-B.
Project : Wellhead Desander Project, PETRONAS Carigali, (Various Locations) (2008 – 2013)
Sand being collected into Sand-Bin.
Complete installation of Liquid Desander complete with collector.
Sand Separator fabrication in progress
Fabrication of collector’s closure at fabrication yard
Installation in progress for Liquid Desander complete with collector
Installation of Liquid Desander fittings.
Installation in progress at site.
Deoiler System
Project : Angsi Sand Collection Systems, PETRONAS Carigali, Peninsular Malaysia Operations (2013 – 2014)
Installation crew
Installation of desander skid
Inlet and outlet line of desander
Installation of desander skid
Installation of desander skid collector and base
Scaffolding works
Opening of sand collector
Collector cleaning Witness by PCSB personnel
Cleaning of sand collector
Sand collected.
Sample of sand collected
Sand bag used for sand collection
Project : Wellhead Desander Project, PETRONAS Carigali, Sabah Operations (2014)
Close valves between desander and sand accumulator
Close valves between desander and sand accumulator
Opening discharge valve
Opening discharge valve
Sand collected
Sand collected